Product Details:
|
Material: | Pu Nbr Ptfe | Size: | Avaliable |
---|---|---|---|
Package: | Bag Or Carton | Delivery Time: | 3-15 Days |
Payment Terms: | T/T, Western Union | Performance: | Loader Cylinder Hydraulic Oil Sealing |
Highlight: | 9X2644 Cylinder Seal Kits,2463440 Cylinder Seal Kits,2275350 |
2275350 9X2644 Cylinder Seal Kits 7X2713 7X2816 7X2673
2275350 9X2644 8T1909 2463440 7X2713 7X2816 7X2673 7X2705
2275350 KIT-SEAL parts 120M, 12M, 518C KIT
CA2275350
227-5350
2275350
Compatible equipment models: 2275350:
Excavator Solenoid Valve | Transducer Sensor | Excavator Turbo |
Center Joint Seal Kit | Excavator Spare Parts | Excavator Engine Parts |
Floating Oil Seal | Valve Seal Kit | O Ring Seal |
Final Drive Seal Kit | TC Oil Seal | Hydraulic Motor Seal Kits |
Excavator Seal Kit | Hydraulic Breaker Seal Kit | Pump Seal Kit |
Excavator Hydraulic Parts | Excavator Monitor | Excavator Starter Motor |
Boom Cylinder Seal Kit | Arm Cylinder Seal Kit | Bucket Cylinder Seal Kit |
Track Adjuster Seal Kit |
Illustration 1 g00886146
The ATB is loed on the subpanel within the control panel.Replacement Procedure
Shut down the engine. Remove the positive lead wire from the battery.
Make sure that all wires at the terminal strip of the ATB are marked with the respective termination point. During reassembly, these wires must be reattached to the correct terminal. Remove all external wires from the terminal strip.
Disconnect the ATB connector from the harness connector.
Remove all mounting nuts and mounting screws that fasten the ATB to the subpanel. Remove the ATB.
Place the new ATB in the subpanel. Install the mounting nuts and mounting screws. Tighten the mounting nuts and mounting screws.
Reconnect the harness connector to the ATB. Reconnect all the wires to the terminal strip that were removed. Reconnect the positive lead wire to the battery. If necessary, see the Generator Set Wiring Diagram in Testing And Adjusting, "Schematics and Wiring Diagrams".
Program the bar code (calibration value) for the voltmeter/ammeter into the GSC. See System Operation, "Voltmeter/Ammeter Programming OP8".
If the generator set is operating in parallel with another generator set and the voltmeter values must match, then reprogram the AC offset. See System Operation, "AC Offset Adjustment OP10".
Contact Person: SUNNY
Tel: 86 18605253464