logo
Send Message
Home ProductsHydraulic Cylinder Seal Kits

CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal

I'm Online Chat Now

CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal

CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal
CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal

Large Image :  CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal

Product Details:
Place of Origin: CHINA
Brand Name: WG CTP SKF
Model Number: SEAL U CUP For Hydraulic Cylinder Rod Seal CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200
Payment & Shipping Terms:
Minimum Order Quantity: MOQ 5 SETS
Price: Negotiable
Packaging Details: PP Bag Inside,Carton Box Outside
Delivery Time: Within 3-15 days after getting your desposit
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 1000

CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal

Description
Material: Rubber,PTFE,NBR Type: Hydraulic Breaker Seal Kit
Highlight:

hydraulic cylinder rod seal U cup

,

CTC hydraulic cylinder seal kit

,

U cup seal for hydraulic cylinder

SEAL U CUP For Hydraulic Cylinder Rod Seal CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200

 

Compatible equipment models: 6J1878:

EXCAVATOR 225
WHEEL SCRAPER 651
WHEEL TRACTOR 621 621B 621E 621F 627E 631C 631E 63

Compatible equipment models: 7J0375:

TRACK LOADER 951B
WHEEL SCRAPER 633 633D

7E 639D 641B 651E 657E

CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal 0

CTC 6J1878 CTC 7J0375 CTC 0352380 CTC 3E4284 CTC 5J8150 CTC 5J8175 CTC5J8200 SEAL U CUP For Hydraulic Cylinder Rod Seal 1

Initial Start-Up
Measure the insulation resistance of each winding if the generator was exposed to the following conditions:
Rapid changes in temperature
Freezing
Wet climate during shipment
Wet climate during storageRefer to this Operation and Maintenance Manual, "Insulation - Test".Note: These tests should be conducted prior to any power connections or control connections that are being made.Starting
Make all preliminary engine starting checks.
Be sure that the main circuit breaker or the line circuit breaker is open.
Start the engine. Allow the engine to warm up.
Adjust to the full load engine speed.
Close the main circuit breaker.
Apply the load. Do not try to apply the full load. Apply the load in increments in order to maintain system frequency at a constant level.
Readjust the governor for rated frequency. Adjust the Voltage
Adjust the voltage regulator in order to obtain the proper voltage. Refer to Operation and Maintenance Manual, "Voltage Regulators" for more information about the voltage regulator.
Turn the remote adjustment potentiometer to the center position, if equipped.
Connect an analog voltmeter that is calibrated for 50 VDC on terminal E+ and terminal E-.
Connect a voltmeter that is calibrated for 300 VAC to 500 VAC or 1000 VAC to the output terminals of the generator.
Make sure that the ST3 wire is positioned on the desired frequency. Also, the engine speed must be changed from the factory setting in order to change the frequency of the generator.
Turn voltage potentiometer (P2) to a full counterclockwise position.
Turn stability potentiometer (P3) counterclockwise to about 1/3 of the total rotation for the potentiometer.
Start the engine and set the engine speed to a frequency of 48 Hz for 50 Hz or 58 Hz for 60 Hz.
Adjust the output voltage to the correct value with potentiometer P2. This voltage should be the rated voltage UN for single operation or UN plus 2% to 4% for parallel operation with a current transformer. Use potentiometer P3 to make adjustments if the voltage oscillates. Adjust potentiometer P3 in both directions while you observe the voltage between E+ and E-. The voltage between E+ and E- should be approximately 10 VDC. The best response times are obtained at the limit of the instability. Try cutting or replacing the wire ST2 if no stable position can be obtained.
Check the LAM operation. ST5 must be closed. Stopping
Remove the load in increments.
Open the circuit breaker.
Allow the engine to run for five minutes in order to cool.
Stop the engine.

 

Contact Details
Jiangsu Runfeng Jiu Seals Co., Ltd.

Contact Person: SUNNY

Tel: 86 18605253464

Send your inquiry directly to us (0 / 3000)